Find best Interview questions and answer for Vitech systems group Job. Some people added Vitech systems group interview Questions in our Website. Check now and Prepare for your job interview. Interview questions are useful to attend job interviews and get shortlisted for job position. Find best Vitech systems group Interview Questions and Answers for Freshers and experienced. These questions can surely help in preparing for Vitech systems group interview or job.
This page contains the most recently asked technical questions and answers in the Vitech systems group.
All of the questions listed below were collected by students recently placed at Vitech systems group.
Lets call the 5 litre jug as jug A and 3 litre jug as jug B. Now, follow the steps:
Fill jug A completely. Now it contains 5 litres.
Slowly pour the water from jug A to jug B until jug B is completely filled. Now, jug A contains 2 litres and jug B contains 3 litres.
Throw away the water in jug B so that it is completely empty. Now, jug A contains 2 litres and jug B is empty.
Transfer the water from jug A to jug B. Now, jug A is empty and jug B contains 2 litres.
Fill jug A completely. Now, jug A contains 5 litres and jug B contains 2 litres.
Transfer water from jug A to jug B until jug B is completely filled. Now, jug A contains 4 litres and jug B contains 3 litres.
Now you have 4 litres of water in jug A.
Let d = 7r. And use distance is = rate × time
7r= ( r+12) 5
7r= 5r + 60
Subtract 5r from both sides
2r = 60
Divide out 2
Rate = 30 km/h
Original question 30 km/h × 7 = 210
30 +12 = 42× 5 = 210
A & B one day work= 1/18 + 1/30= 8/90
As we know that number of work is 1
1÷8/90= 1*90/8= 90/8.
Since they say “ twice the amount of work
Then ,2*90/8= 22.5 days
One day’s work of A, B and C = (1/24 + 1/30 + 1/40) = 1/10.
C leaves 4 days before completion of the work, which means only A and B work during the last 4 days.
Work done by A and B together in the last 4 days = 4 (1/24 + 1/30) = 3/10.
Remaining Work = 7/10, which was done by A,B and C in the initial number of days.
Number of days required for this initial work = 7 days.
Thus, the total numbers of days required = 4 + 7 = 11 days.
Answer:270
Explanation: Formula is SI= P*R*T/100
Where P is principal amount
R is Rate
T is Time
So, SI= 500*6*9/100
i.e SI= 27000/100
SI= 270
That will depend heavily on when in the journey the 200 men join.
Let ‘N’ is the smallest number which divided by 13 and 16 leaves respective remainders of 2 and 5.
Required number = (LCM of 13 and 16) – (common difference of divisors and remainders)
= (208) – (11) = 197.
(T-P)-(U-Q)-(V-R)-(W-S)
S Opposite is Q
U sits the P and Q
55 + 70 = 125
125/14hrs = 60 mph
14 hours