s=36kmph
in meter per second is=36*5/18=>10
Employee Performance Standards. Employee performance measurements can determine an employee’s compensation, employment status or opportunities for advancement.
22
sunday
cost price(c.p) of one fruit = 24/16
(c.p) = Rs 1.50
selling price(s.p) of one fruit = 18/8
(s.p) =Rs 2.25
profit for one fruit = 2.25 – 1.50 = 0.75
profit
profit % = ———– * 100
cost price
0.75
= ——- * 100
1.50
= 50%
Avg = 2(X*Y)/X+Y
2*(60*40)/60+40
2*(2400)/100
2*24
48.
Let’s assume the length of each train is ‘L’ and the speeds of the two trains are ‘V₁’ and ‘V₂’ respectively.
When the trains are moving in the opposite direction, their relative speed is the sum of their individual speeds. The total distance they need to cover is the sum of their lengths. Since they cross each other completely in 5 seconds, we can set up the following equation:
(V₁ + V₂) × 5 = 2L
When the trains are moving in the same direction, their relative speed is the difference between their individual speeds. The total distance they need to cover is the difference between their lengths. Since they cross each other completely in 15 seconds, we can set up the following equation:
(V₁ – V₂) × 15 = 2L
Now, let’s solve these equations to find the ratio of their speeds.
From the first equation, we have:
(V₁ + V₂) × 5 = 2L
V₁ + V₂ = (2L) / 5
From the second equation, we have:
(V₁ – V₂) × 15 = 2L
V₁ – V₂ = (2L) / 15
Let’s add these two equations together:
V₁ + V₂ + V₁ – V₂ = (2L) / 5 + (2L) / 15
2V₁ = (6L + 2L) / 15
2V₁ = (8L) / 15
V₁ = (4L) / 15
So, the speed of the first train is (4L) / 15.
Now, let’s substitute this value back into the first equation to find V₂:
(4L) / 15 + V₂ = (2L) / 5
V₂ = (2L) / 5 – (4L) / 15
V₂ = (6L – 4L) / 15
V₂ = (2L) / 15
Therefore, the speed of the second train is (2L) / 15.
The ratio of their speeds is given by:
(V₁ / V₂) = ((4L) / 15) / ((2L) / 15)
(V₁ / V₂) = 4L / 2L
(V₁ / V₂) = 2
So, the ratio of their speeds is 2:1.
a/g
2.5 sec
4 days
1000 cu.m
43.69
Because the total distance will be =100+80000m=80100m. Thus two train coming towards, so the speed will be increase. speed will be =60+50=110km/h, The time of crossing will be 43.69 minutes.
we can draw 12 tangents, 4 for 2 circles and 12 for 3
circles
I am looking for a qualified chartered accountant in my profile who is known for his excellence in the field.