D
3.14
127.179(app)
given distance of the train along the wind is 695
and againt the wind is 498
and time = distance/speed
as we know that time is equal in both the cases hence equate
695/s1=498/s2———–(1);
where s1=speed of the plane + speed of the wind
and s2=speed of the plane -speed of the wind
given that speed of the wind is 21k/h
s1=sp+21
s2=sp-21
substitu in eq 1
we get the answer as 27.17(app)
Slice the cake
56.25%
Business Process Outsourcing, or BPO, refers to the process of contracting standard business functions to be handled by a party outside of the company.
BPO is the abbreviation for business process outsourcing, which refers to when companies outsource business processes to a third-party (external) company.
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
( c ) R or T
360 times
19, 26, 33, 46, 59, 74, 91
Answer 33
Adding 7,9.13,15,17
Correct is 35
125, 106, 88, 76, 65, 58, 53
88
3000
3, 7, 15, 39, 63, 127, 255, 511
C. 39
3*2+1 = 7
15*2+1 = *31*
31*2+1 = 63
63*2+1 = 127
127*2+1 = 255
255*2+1 = 511
B. 9001
X+x+2+x+3=42
3x+6=42
3x=42-6=36
X=12
X+2=14
X+3=15
Middle number 14
GIVEN: 2A(B+C)+AC-2C(A-B)
THEREFORE 2AB+2AC+AC-2AC+2BC
2AB+AC+2BC
2(AB+BC)+AC
LET b1=AB b2=BC b3=AC
STEP1: b1 = b1+b2
so b1 = AB+BC
THEREFORE
NOW: b1 = AB+BC b2 = BC b3 = AC
STEP 2: b3 = b1+b3
so b3 = AB+BC+AC
THEREFORE
NOW: b1 = AB+BC b2 = BC b3 = AB+BC+AC
STEP3:
NOW: b1 = b1+b3
so b1 = AB+BC+AB+BC+AC
=2(AB+BC)+ AC
AB BC AC
STEP1 AB+BC BC AC
STEP2 AC BC AB+BC+AC
STEP3 AB+BC+AB+BC+AC BC AB+BC+AC
i.e 2(AB+BC)+AC BC AB+BC+AC