In 30 mins- Thief – 20km, Owner – 0km
In 1hr – Thief – 40km, Owner – 25km
In 1.5hrs – Thief – 60km, Owner – 50km
In 2hrs – Thief – 80km, Owner – 75km
In 2.5hrs – Thief – 100km, Owner – 100km
Answer: In 2.5 hours the owner would have overtaken the Theif
the answer is E
Monday =y cheques
Tuesday =3y cheques
wednesday=4000 cheques
totaling to 16000 cheques
therefore y+3y+4000=16000 cheques
4y+4000=16000 cheques therefore 4y=16000-4000 cheques= 4y=12000cheques
therefore y=12000/4=3000 cheques
monday=3000 cheques
tuesday=3×3000=9000cheques
let original radius=100
original surface area lets say it x =4 * (22/7) * 100 *100
new radius=100 + 50% of 100=150
new surface area lets say it y = 4 * (22/7)* 150* 150
increase in surface area=((y-x)/x) * 100
i.e.
((4*(22/7)*150*150 – 4*(22/7)*100 *100) / (4*(22/7)*100*100))*100
=125
so the answer is 125%.
hope this helps you.
Let’s say, length of train = x metres
Speed at pole = Speed at platform
x/15 = 100+x / 25
5x = 300 + 3x
2x = 300
x = 150m
So, train is 150 metres long.
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
Given:
Principle Amount(P):₹5000
S.I:₹16500
Rate of Interest(R):15%
Find:T
SI=P*T*R/100
T=SI*100/P*R
T=16500*100/5000*15
T=22 YEARS
24
10 Camels = 68000
=12.05×5.4/0.6
=12.05×9.0
=108.45
length is 30 breadth is 12 and height is 12
——————————
1
.——————————
1 .
1 .
1 10 .
1
1 .
1
1
1 30 .
——————————-.
1
consider right angled triangle
so the distance= square root of (30*30+10*10)