Ques:- Tell us something about your past working experience?
Ques:- What job position are you currently holding with yourcurrent employer?
Ques:- One train leaves Los Angeles at 15mph heading for New York. Another train leaves from New York at 20mph heading for Los Angeles on the same track. If a bird, flying at 25mph, leaves from Los Angeles at the same time as the train and flies back and forth between the two trains until they collide, how far will the bird have traveled?
Ques:- Suppose a clock takes 7 seconds to strike 7. How long will it take to strike 10?
Ques:- Which of the following statements drawn from the given statements are correct?Given:All watches sold in that shop are of high standard. Some of the HMT watches are sold in that shop.a) All watches of high standard were manufactured by HMT.b) Some of the HMT watches are of high standard.c) None of the HMT watches is of high standard.d) Some of the HMT watches of high standard are sold in that shop.
Ques:- If the numbers from 1 to 24, which are divisible by 2 are arranged in descending order, which number will be at the 8th place from the bottom?
A. 18
B. 16
C. 12
D. 10
Recent Answer :
: 1 through 24, divisible by 2 in descending order.
That leaves you with:
24, 22, 20, 18, 16, 14, 12, 10, 8, 6, 4, 2
8th place FROM the bottom means your answer will be 16.
Ques:- Two computers each produced 48000 public utility bills in a day. One computer printed bills at the rate of 9600 an hour and the other at the rate of 7800 an hour. When the first computer finished its run, how many bills did the other computer still have to print?
Recent Answer :
: 9000
Ques:- Family background & about education
Ques:- Last month salareis how much
Ques:- Before where did you worked?
Ques:- What is the next number of this sequence 10,8,7,14,15,13,12,24,25,23?
Recent Answer :
: 22
Ques:- What is Goal.
Ques:- A contractor undertakes to complete the construction of a tunnel 720 meters long in 240 days and employs 60 men for the purpose. After 120 days, he finds that only 240 meters of the tunnel is complete. How many more men should be employ in order to complete the work in time?
Recent Answer :
: 60 more men
Ques:- Why do you think you are suitable for this job?
Ques:- In each questions below are given two statements followed by two conclusions numbered I and II.
Statements :
No man is a donkey. Rajesh is a man.
Conclusions :
I. Rajesh is not a donkey.
II. All men are not Rajesh.
Statements :
No man is a donkey. Rajesh is a man.
Conclusions :
I. Rajesh is not a donkey.
II. All men are not Rajesh.
A. if only conclusion I follows
B. if only conclusion II follows
C. if either conclusion I or II follows
D. if neither conclusion I nor II follows
E. if both conclusions I and II follow
Recent Answer :
: E
Ques:- Are you willing to change your role and profile when required for a project?
Ques:- How was my experience in the last company?
Ques:- Do you have or know someone with pain?
Ques:- A garrison of 2000 men has provisions for 54 days. At the end of 15 days, a reinforcement arrives, and it is now found that the provisions will last only for 20 days more. What is the reinforcement?
Recent Answer :
: 1900
Ques:- A rich merchant had collected many gold coins. He did not want anybody to know about them. One day his wife asked, “How many gold coins do we have?” After pausing a moment, he replied, “Well! If I divide the coins into two unequal numbers, then 32 times the difference between the two numbers equals the difference between the squares of the two numbers.”The wife looked puzzled. Can you help the merchant's wife by finding out how many gold coins they have?
Recent Answer :
: I think it’s 32 not 37
Ques:- If the perimeter of a rectangular garden is 600 m, its length when its breadth is 100 m is?
Ques:- What are the duties and responsibilities of an administrator?
Ques:- Tell us about your experience in handling grievances.
Ques:- “can we fit 8 numbers (1 to 8) in 2X4 matrix such that any element in any cell should not adjacent or diagonal to next or previous element EX: 1 2 – – –>invalid EX: 1 6 7 4–>invalid 2 – – – EX: 1 4 7 3 —>invalid- 2 – – …”
Recent Answer :
: 2637
4815
OR
2817
4635
Ques:- it takes 8 , 12 and 16 days for A , B and C to complete to task . how many days will it take if A works on the job for 2 days and then B works on it until 25 % of the job is left for C to do , and C completes the work ?
Recent Answer :
: C will take 4 days and the total number of days taken by a,b and c will be 12 days.
Ques:- TELL ME THE STORY OF THE LAST MOVIE U SAW?
Ques:- How do you handle stress, pressure and anxiety?
Ques:- UK Shift timings and salary
Ques:- Have you ever faced a challenging situation? How did you deal with it?
Ques:- Tell me abot your self
insufficient information distance between LA and NY is not
given it should be given to find the no solution