2, 3, 6, 15, 52.5, 157.5, 630
15a=45
835, 734, 642, 751, 853, 981, 532
835,sum(digits)= 16
734 = 14
642=12
751= 13,
853=16,
981=18,
532=10
answer(c)751
35 is not the factor of 120 so…35 is the answer
4%
4
Soldier have to move 0.75 miles to West and then 0.375 miles to South to reach the camp.
How:-
Firstly soldier moving 1 mile to East from camp and then 1/2 miles= 0.50 miles to North .
Then it is moving 1/4 miles =0.25 miles to west
And then 1/8 miles =0.125 miles to South
Now we just have to count the difference and minus the value of camp to East with the value of North to west = 1mile – 0.25miles(1/4) = 0.75 miles
Same case with north and south = 0.50 miles(1/2) – 0.125 miles(1/8) = 0.375 miles
Hence proves to return camp the soldier have to move 0.75 miles to west and 0.375 miles to south
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
2:3
10000
let x be sum.
SI of 18% for 1 year= x*18/100=0.18x;
SI of 18% for 2 years is 0.36x;
SI of 12% for 1 year= x*12/100=0.12x;
SI of 12% for 2 years is 0.24x;
Given, 0.36x-0.24x=840
0.12x=840
x=840/0.12=7000.
Let numbers be 2x, 3x
Given: (2x)^3 + (3x)^3 = 945
8x^3 + 27x^3 = 945
x = 3
Difference between numbers = 3x – 2x = x
Hence difference = 3
52.5