Find best Interview questions and answer for Css corp Job. Some people added Css corp interview Questions in our Website. Check now and Prepare for your job interview. Interview questions are useful to attend job interviews and get shortlisted for job position. Find best Css corp Interview Questions and Answers for Freshers and experienced. These questions can surely help in preparing for Css corp interview or job.
This page contains the most recently asked technical questions and answers in the Css corp.
All of the questions listed below were collected by students recently placed at Css corp.
45
The answer is depend on the distance between Mysore &
Bangalore which is not given in the question.Bird
travel=Distance/35*25km
c-> structured oriented lang
Pascal-> Procedure oriented lang
cannot be determined .
ans : 101 bcoz after every two matches one team is eliminated…so to eliminate 50 team there will be require 100 matches…+ 1 for deciding winner…
Your donation keeps our website running smoothly and accessible to all. Support us today to ensure we continue to provide valuable information and resources.

To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
No, the tank will be filled after 36 minutes
24/16= 1,5
24×1,5= 36
D