Css corp Interview Questions Answers, HR Interview Questions, Css corp Aptitude Test Questions, Css corp Campus Placements Exam Questions

Find best Interview questions and answer for Css corp Job. Some people added Css corp interview Questions in our Website. Check now and Prepare for your job interview. Interview questions are useful to attend job interviews and get shortlisted for job position. Find best Css corp Interview Questions and Answers for Freshers and experienced. These questions can surely help in preparing for Css corp interview or job.

This page contains the most recently asked technical questions and answers in the Css corp.

All of the questions listed below were collected by students recently placed at Css corp.

Ques:- A and B entered into a partnership investing Rs.16,000 and Rs.12,000 respectively. After 3 months, A withdrew Rs.5000 while B invested Rs.5000 more. After 3 years of C, out of a total profit of Rs.21,000. The share of B exceeds that of C, out of a total profit of Rs.26,400 after one year by
A. Rs. 2400
B. Rs. 3000
C. Rs.3200
D. Rs.3600
Recent Answer : Added by narendra On 2022-09-18 09:02:51:

D

Ques:- A, B and C rent a pasture. A puts 10 oxen for 7 months, B puts 12 oxen for 5 months and C puts 15 oxen for 3 months for grazing. If the rent of the pasture is Rs.175, how much must C pay as his share of rent?
A. Rs. 45
B. Rs. 50
C. Rs. 55
D. Rs. 60
Recent Answer : Added by MANOJ M On 2021-10-07 15:40:52:

45

Ques:- . One train leaves Bangalore at 15 kmp heading for Mysore. Another train leaves from Mysore at 20kmp heading for Bangalore on the same track. If a bird, flying at 25kmp, leaves from Bangalore at the same time as the train and flies back and forth between the two trains until they collide, how far will the bird have traveled?
Recent Answer : Added by Admin On 2020-05-17 12:05:20:

The answer is depend on the distance between Mysore &
Bangalore which is not given in the question.Bird
travel=Distance/35*25km

Ques:- What are the differences between Pascal and C.
Recent Answer : Added by Admin On 2020-05-17 12:02:26:

c-> structured oriented lang
Pascal-> Procedure oriented lang

Ques:- M/N = 6/5 3M+2N = ?
Recent Answer : Added by Admin On 2020-05-17 11:59:21:

cannot be determined .

Ques:- In a knockout tournament 51 teams participated. A team is out if the tournament if the team lost twice. How many matches to be held to choose the winner?
Recent Answer : Added by DK BOSS On 2021-07-17 06:18:22:

ans : 101 bcoz after every two matches one team is eliminated…so to eliminate 50 team there will be require 100 matches…+ 1 for deciding winner…

Your donation keeps our website running smoothly and accessible to all. Support us today to ensure we continue to provide valuable information and resources.

Ques:- Why u have low percentage in ur first year,while good marks in other years??
Ques:- What are the three things you would like to change in this world?
Ques:- How was ur progress measured? How were u rated
Ques:- My qualification
Ques:- Are you interested in helping others?
Ques:- Which is your dream company and why?
Ques:- What do u do after losing current job withougt information ?
Ques:- WHY DID U WANT TO JOIN US
Ques:- Tell me about a specific task you undertook, which was a challenge for you?
Ques:- About professinal work experience and one of my other music professional exp. and i was through campus into this company
Ques:- About project
Ques:- A,B and C needs 8, 12 and 16 days respectively to finish a task. How many days will it take if A works for 2 days then B works on it until 25% of the job is left for C to do, and C completes the work?
Recent Answer : Added by Deven Sharma On 2023-05-31 18:36:37:

To solve this problem, we can break it down into steps:

Step 1: Determine the individual rates of work for A, B, and C.

If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.

Step 2: Calculate the combined work rate of A and B.

If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.

Step 3: Calculate the time it takes for B to complete 75% of the task.

Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.

Step 4: Calculate the remaining work for C.

If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.

Step 5: Calculate the time it takes for C to complete the remaining work.

Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.

Step 6: Calculate the total time required.

A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.

Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.

Ques:- Pipe A can fill a tank in 16 minutes and pipe B cam empty it in 24 minutes. If both the pipes are opened together after how many minutes should pipe B be closed, so that the tank is filled in 30 minutes?
Recent Answer : Added by Gabriel On 2022-09-15 16:38:59:

No, the tank will be filled after 36 minutes

24/16= 1,5

24×1,5= 36

Ques:- The ratio of the earnings of P and Q is 9:10. If the earnings of P increases by one-fourth and the earnings of Q decreases by one-fourth, then find the new ratio of their earnings?
Scroll to top