10, 25, 45, 54, 60, 75, 80
54
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
P’s one min work=1/18
Q’s one min work=1/24
P’s x min work+Q’s 12 min work = tank fully filled ( 1 )
x(1/18)+12(1/24)=1
x=9 min
125% of s = 60
=> 1.25s = 60
=> s = 60*4/5
=> s = 48
60 – s = 60 – 48 = 12
My greatest achievement is to avoid Giving up since it made me who l am today and l am able to walk fearless towards achieving my goals.
Fuel to go = x + (x/4)=5x/4
Fuel to come = x
now,
x+(5x/4) = 4.5
9x/4 = 4.5
9x = 18
x = 2 (Fuel to comeup)
Fuel to go will be:
2+(2/4) = 2 + (0.5) = 2.5
G.c.d=num1 *num2/lcm
Num1=20
Gcd=5
Lcm=60
5=(20*num2)/60
Num2= 5*60/20
Num2=15
( d ) 8404
Collective performance
Postive attitude towards working
Shaping team player
Turning individuals into team players